Installation of the SCC plant in St. Petersburg

The installation of the plant for the production of unique dry building mixtures with perlite in St. Petersburg enters the final stage.More

Microdaoization scheme and SSC plantThe factory uses the vertical layout of the layout, the productivity of the plant is up to 15 tons per hour. Unique mixtures with perlite will be made and therefore a special package is made in bags so as not to damage the fragile and large perlite filler.

The supply of microdists is also fully automated, for which microdontus and module of their 100% transmission to the mixer are used.

The plant is fully automated, automation siemens.

A letter of thanks for a good job was received from the customer.

View the description of typical dried mixtures with prices >>

Letter of a letter

Installation of the plant of dry mixtures

Installation of the line of dry building mixtures