Between the company LLC “Kormix” of the Russian Federation and Cormix International Limited, a contract was signed for the construction of a plant in Russia for the production of waterproofing materials of the Cormix brand.
The project and equipment were made by our plant.
More
This line was developed by the engineers of the AAMIX plant and consists of both standard equipment components under the Sunmyx brand (patented brand of the Aamix plant for Russia and the world market), and from unique developments created specifically for this project.
Stages of production
- At first, our engineers, a full 3D model of the entire line was created and worked out
- Then, at the factory in St. Petersburg, all components and automation were produced
- Then everything was assembled together and tested at the Aamix factory
- And then sent to the customer.
Customer and installation location
- Line Customer – Cormix company
- Place of installation – the city of Vologda
- Mixtures produced – waterproofing
- http://cormixhydro.ru/about
The next stage is the installation and launch of the line.
Stages of work in drawings and photographs
It is necessary to produce
The project has been done
A technological scheme has been made
Electric circuits are made
There is one sheet, there are about 50 of them for this plant
Equipped equipment produced, verified and shipped
The equipment is painted silver on the request of the customer.
Big-in-Bigs SunmyxAndMixer of dry mixtures Sunmix prof
Silos components
metal structures
Further, installation and commissioning are also performed by our highly qualified engineers with extensive experience (Holland, Gazprom, factories in St. Petersburg and Kalinigrad, etc.)
Aamix plant – confidence in quality and support!