In April, our plant was produced and put in St. Petersburg a complex of equipment on drying quartz sand, with a capacity of 5 tons/hour.More
Loading into a boot hopper will be made by an excavator. Unloading in cars (at the first stage) in a bulk in the body.
In the future (the second stage of the production cycle), it is planned to put a sieve on the allocation of a fraction of 0.63 with the packaging of it in the Big Bags and (the third stage) installation of the CSC production line.
The engineers of our company developed a development plan and all equipment was selected.
The drying complex of sand is produced and set.