In January 2013, the plant was delivered for the production of dry building mixtures to the city of Klin.More
A distinctive feature of the delivered plant is increased performance by installing 2 mixers of dry mixtures.
At the same time, the dashing of all components is carried out by one node, and the dose components are switched automatically by a special cross -line valve.
This development made it possible to reduce the cost of equipment by almost 3 million rubles.