The third full cycle plant in Kaliningrad

In September 2019, the production of a complete plant of dry building mixtures for Kaliningrad Construction Company Hermes Stroy Plus is completed. The plant makes a mixture for a complete chicou with a foot of sand.

This is the third plant developed and put into this region, which in itself indicates the quality and support of our equipment.

More

Dry mixture plant

This plant will launch in October 2019. Our experts made a full project, after which all the equipment, automation system was performed, the control program for the right recipes was written.

Factory characteristics:

  • 5 tons per hour performance
  • Drying of sand
  • packing in bags 20-30kg
  • Automatic control

The composition of the equipment + the full set of drawings can be viewed in the project file.Download the project file.

As usual, 3D model (below) was created at the plant, a full layout of flat drawings and then everything was accurately made according to the agreed project.

Unique for our customers!We place the production process on Instagram. When ordering equipment at our factory, you will see the process of production of your order, assembly quality, shipment process.

We are a completely open company aimed at the production of high -quality and modern equipment, which will make profit to our customers and work long and reliably.

https://www.instagram.com/aamixplant/